Home Mumbai Metro Line 9 (Red Line): Stations, Fare, Route Map, Status, & Timeline

Mumbai Metro Line 9 (Red Line): Stations, Fare, Route Map, Status, & Timeline

Mumbai Metro Line 9 (Dahisar East – Mira Bhayandar) metro corridor is 11.38 KM fully Elevated and consists of 7 stations from Dahisar East – Mira Bhayandar.

Metro corridor 9 is an extension of the Metro line 7 plan. Initially, it was planned to run the metro line between Dahisar and Andheri, but later, the state government decided to extend the metro route.

The entire metro route stretch for metro lines 7, 7A, and line 9 are officially color-code as Red and also called as Mumbai Metro Red Line.

Mumbai Metro Line 9 (Dahisar East – Mira Bhayandar) Stations

Below is the list of stations on Mumbai Metro Line 9 i.e., Dahisar East – Mira Bhayandar corridor. There are a total of 10 stations on the line, which are fully elevated.

#Station NameStatusTypeConnections
1Dahisar(E)Under ConstructionElevatedInterconnect Mumbai Metro Line 7 – Red Line and Mumbai Metro Line 2A – Yellow Line
2Pandurang WadiUnder ConstructionElevated

3Amar Palace (Miragaon)Under ConstructionElevatedInterconnect Mumbai Metro Line 10 – Green Line
4Zankar Company (Kashigaon)Under ConstructionElevated

5Sai Baba NagarUnder ConstructionElevated

6Deepak Hospital (Medtiya Nagar)Under ConstructionElevatedInterchange station for other branch MBMC Sports Complex and Indralok Stations
7Shahid Bhagat Singh Garden (Maxus Mall)Under ConstructionElevated

8Subhash Chandra Bose StadiumUnder ConstructionElevated

9MBMC Sports ComplexUnder ConstructionElevated

10IndralokUnder ConstructionElevated

Mumbai metro Line 9 Construction

Project History and Other Details

Project Overview

Project/Metro Name: Dahisar East – Mira Bhayandar Corridor

Line Number: 9

Official Line Color: Red

Status: Under Construction

Distance: 11.38KM

Total Stations: 10 Stations

Depot: Mira Bhayander Depot

Operator: Mumbai Metropolitan Region Development Authority (MMRDA)

Project Started: September 2019

Project Completion:

Estimated Cost: ₹6518 Crore (Metro lines 7A and 9)

Detailed Project Report (DPR)View Here

Website: https://mmrda.maharashtra.gov.in/metro-line-9

Ridership Details

Daily Estimated Ridership: 8.47 lakhs/day by 2021 and 11.12 lakhs/day by 2031. (Estimation including Metro Line 9 and 7A)

Metro Timings: 

Metro Fare: 

Technical Overview

Track length: 11.38 km 

Track Type: Elevated

Metro Type: Rapid Transit

Number of tracks: 2

Operating Speed: 80km/hr (50mph)

Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge

Electrification: Overhead 25 kV AC

Image Gallery:

Timeline Mumbai Metro - Line 9 (Red Line)